India

Noida International Airport: From Capacity to Cost to Convenience, Jewar Airport Explained in Numbers

Prime Minister Narendra Modi will on Thursday lay the muse stone of the Noida International Airport (NIA) in Jewar in line along with his authorities’s imaginative and prescient to “boost connectivity” and create a “future-ready aviation sector”. With the Noida airport, set to be accomplished by 2024, Uttar Pradesh is poised to turn out to be the one state in India to have 5 worldwide airports.

The Noida airport will primarily assist decongest the Indira Gandhi International (IGI) Airport, and is strategically positioned and can serve the individuals of cities together with Delhi, Noida, Ghaziabad, Aligarh, Agra, Faridabad and neighbouring areas. According to a PMO assertion, that is the primary time that an airport in India has been conceptualised with an built-in multi-modal cargo hub, with a deal with lowering the full value and time for logistics.

From capability to value, right here’s a take a look at the Noida International Airport in numbers:

4 – Number of phases in which the Noida International Airport will likely be accomplished

36 Months – Expected length for completion of the primary part. The airport is about to be operational in 2024

20 Years – Estimated interval for completion of all 4 phases of the challenge

Rs 29,560 Crore – Estimated whole value of the challenge

Rs 35,000 Crore – Total value of investments the Noida airport is predicted to convey to Uttar Pradesh

1 Lakh – Job alternatives the challenge is predicted to generate in the world

12 Million – Number of passengers every year the airport is predicted to deal with in the primary part

70 Million – Number of passengers every year the Noida airport is predicted to deal with in any case 4 phases are full

186 – Number of stands the airport is about to have to home planes

1 Million Tonne – Estimated capability of the airport’s cargo terminal

21 Minutes – Estimated journey time for Delhiites to the airport as soon as the proposed Delhi-Varanasi high-speed rail is accomplished. The 800-km rail line may have a station on the Noida airport

3,500 Acres – Land requirement for the challenge envisaged at current

72 km – Road distance from the IGI Airport to the Noida airport

40 km – Road distance from Noida, Faridabad and Ghaziabad

28 km – Distance from Greater Noida to the Noida airport

65 km – Distance from Gurgaon

130 km – Road distance from Agra to the Noida International Airport

Read all of the Latest News, Breaking News and Coronavirus News right here. Follow us on Facebook, Twitter and Telegram.




Source link

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button

Adblock Detected

Please consider supporting us by disabling your ad blocker